✦ FieldBOS AI · Interactive demo
This is a real workflow from the platform, played back: a homeowner sends three photos of a tired dock, and FieldBOS AI drafts the estimate and finds the crew slot. Press play.
Novak Residence · via your FieldBOS website · Fri 9:14p
“Our dock boards are getting soft and my kids keep getting splinters. Ladder is rusted out too. Can you take a look? Photos attached — we're at MM 19, Camdenton side.”
Every claim gets a confidence level — the site visit confirms the rest
≈ 460 sq ft single-well dock — about 46 boards, widespread surface rot on the west span
High3+ joists water-damaged at the seam — sister them, no full frame replacement needed
MediumLadder mount corroded through at both bolts; bumper edging missing on the approach side
HighPilings sound; 4 show waterline wear — wrap while the crew is on-site
MediumFindings will appear here as the photos are analyzed.
Quantities from the photos · prices from your supplier price book · hours from your last 14 dock jobs
Materials
| Composite decking, 1" × 6" × 16' | × 46 | $3,128 |
| Joist repair — PT 2" × 8" × 12' | × 8 | $196 |
| Stainless deck screws (350 ct) | × 3 | $126 |
| Dock ladder, 4-step aluminum | × 1 | $289 |
| Piling wrap kit, 10" | × 4 | $384 |
| Rub rail / bumper edging, 25' roll | × 2 | $236 |
Labor
| Demo & haul-off | 10 hrs | $850 |
| Joist sistering & frame repair | 8 hrs | $760 |
| Deck install & fastening | 16 hrs | $1,360 |
| Ladder, bumpers & piling wrap | 5 hrs | $425 |
| Mobilization, barge & disposal | $890 |
Est. duration
3 crew-days
2-person crew
Crew needed
Carpenter + helper
no CPO required
Weather margin
+1 day
lake conditions, Sep
The AI checks real crew availability, certifications, and job length — then proposes a slot
| Crew | Mon 7 | Tue 8 | Wed 9 | Thu 10 | Fri 11 |
|---|---|---|---|---|---|
| M. Diaz | Marina bulkhead | Marina bulkhead | — | Piling wrap | — |
| T. Cole | Boat lift PM | — | — | — | — |
| R. Patel | Pool route | Pool route | Pool route | Pool route | Pool route |
| K. Osei | — | Pressure wash | Pressure wash | — | Deck stain |
| J. Ferris | Boat lift PM | — | — | — | — |
You review the draft, tweak anything, and hit approve — the customer gets the quote, and the moment they accept, the job is on the board and the materials order is ready.