Quotes
AI-assisted quoting — photos in, scope, materials, and timeline out
Customer request
QUO-118 · Novak Residence · via website form, Aug 28 · 9:14p
“Our dock boards are getting soft and my kids keep getting splinters. Ladder is rusted out too. Can you take a look? Photos attached — we're at MM 19, Camdenton side.”
3 photos · IMG_4482.heic, IMG_4483.heic, IMG_4485.heic
What the AI sees
Drafted by FieldBOS AI · verify on the site visit
≈ 460 sq ft single-well dock; approximately 46 deck boards, widespread surface rot on the west span
HighAt least 3 joists show water damage at the seam — recommend sistering, not full replacement
MediumLadder mount corroded through at both bolts; bumper edging missing on the approach side
HighPilings sound, but 4 show wear at the waterline — wrap while the crew is on-site
Medium
Estimates are drafted from customer photos and your price book, then priced with your margins. Nothing goes to the customer until you approve it.
Drafted quote — dock re-deck & hardware
Based on 3 photos, your price book, and 14 similar past jobs
Materials
| Composite decking board, 1" × 6" × 16' | × 46 | $68.00 | $3,128 |
| Joist repair — PT 2" × 8" × 12' | × 8 | $24.50 | $196 |
| Stainless deck screws (350 ct) | × 3 | $42.00 | $126 |
| Dock ladder, 4-step aluminum | × 1 | $289.00 | $289 |
| Piling wrap kit, 10" | × 4 | $96.00 | $384 |
| Rub rail / bumper edging, 25' roll | × 2 | $118.00 | $236 |
Labor
| Demo & haul-off of failed decking | 10 hrs | $85/hr | $850 |
| Joist sistering & frame repair | 8 hrs | $95/hr | $760 |
| Deck install & fastening | 16 hrs | $85/hr | $1,360 |
| Ladder, bumpers & piling wrap | 5 hrs | $85/hr | $425 |
| Mobilization, barge time & disposal | $890 |
Est. duration
3 crew-days
2-person crew
Earliest start
Tue, Sep 9
fits T. Cole + J. Ferris
Expected completion
Thu, Sep 11
weather margin +1 day
Margin at these prices: 41% · in line with your last 14 dock jobs. Materials priced from your Aug price book (Bayside Lumber).
Recent quotes
| QUO-118 | Novak Residence Dock re-deck & hardware | AI drafted | $8,644 | Review |
| QUO-117 | Willow Run Rentals Dock ladder & bumper | AI drafted | $1,240 | Sent |
| QUO-116 | Osage Cove HOA Pool resurfacing — fall | $22,400 | Draft | |
| QUO-115 | Millstone Point Marina Dock D refurb — phase 1 | AI drafted | $31,750 | Accepted |